Plans in for £112m upstream Leeds flood defences
Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted.Plans for the next phase of the Leeds flood alleviation scheme to reduce flood risk along the River Aire have been submitted.Read Full Article: The Construction Index ... read more
Source: Construction IndexPublished on 2018-12-07